Lamington Bridge re-opened

THE Lamington Bridge over the Mary River between Maryborough and Tinana has been re-opened to cars, with a 40kmh limit.

Because the railings have been removed, pedestrians will not be allowed to cross the bridge.

The bridge may close again as a second flood peak is expected to cause the Mary River to rise again tomorrow.

Council and Department of Transport and Main Roads Main will reassess the situation after the second flood peak passes.

If there is no risk of further inundation, arrangements will be made for the railings to be replaced, and the bridge will return to normal use.







GIG GUIDE: 15 ways to stay entertained for free

premium_icon GIG GUIDE: 15 ways to stay entertained for free

Kick back and relax with live entertainment at venues around Herve Bay.

FIRST RESIDENTS: Over 50s home for Christmas in new Bay site

premium_icon FIRST RESIDENTS: Over 50s home for Christmas in new Bay site

The first group of residents will spend Christmas in their new homes

Welcome to our table: Over 55’s invited to Christmas lunch

premium_icon Welcome to our table: Over 55’s invited to Christmas lunch

50 meal vouchers are available to over 55s in M'boro for Christmas