Lamington Bridge re-opened

THE Lamington Bridge over the Mary River between Maryborough and Tinana has been re-opened to cars, with a 40kmh limit.

Because the railings have been removed, pedestrians will not be allowed to cross the bridge.

The bridge may close again as a second flood peak is expected to cause the Mary River to rise again tomorrow.

Council and Department of Transport and Main Roads Main will reassess the situation after the second flood peak passes.

If there is no risk of further inundation, arrangements will be made for the railings to be replaced, and the bridge will return to normal use.







Fishermen getting salty over ‘sneaky’ satellite monitoring

premium_icon Fishermen getting salty over ‘sneaky’ satellite monitoring

Fishermen getting salty over ‘sneaky’ satellite monitoring

Cashless card 'not to blame for crime spree': Pitt

premium_icon Cashless card 'not to blame for crime spree': Pitt

Both cash and alcohol were stolen during the break-ins.